New Construction

    New Construction Inspections

    A brand-new home is not automatically a perfect home. My three-phase new construction inspection catches defects while they are still visible and correctable - before they are sealed behind walls and before you close.

    Why It Matters

    New Does Not Mean Problem-Free

    Builders and subcontractors work fast. Mistakes, shortcuts, and miscommunications happen on every job site. An independent inspector works for you - not the builder.

    Mistakes Happen

    Even the best builders make mistakes. Subcontractors work at speed, and not every trade communicates with the next. An independent inspector catches what gets missed.

    Protect Your Warranty

    Most new homes come with a 1-year builder warranty. A final inspection documents defects while the builder is still obligated to fix them - at no cost to you.

    Nothing Hidden

    Once drywall goes up, framing, wiring, and plumbing disappear. A pre-drywall inspection is your only chance to see what is behind the walls.

    You Deserve What You Paid For

    New construction is a major investment. You should receive exactly what was specified - not shortcuts, substitutions, or unfinished work.

    Three-Phase Process

    Inspections at Every Critical Stage

    Each phase targets a specific moment when key components are still visible. You can book all three or just the phases you need.

    Phase 1

    Before concrete is poured

    Pre-Pour Foundation Inspection

    I verify the footing and foundation layout, rebar placement, drainage system, and waterproofing while everything is still visible and correctable. Once the concrete is poured, these critical elements are hidden forever.

    • Footing depth, width, and reinforcement
    • Rebar size, spacing, and tie placement
    • Foundation drain and waterproofing membrane
    • Formwork alignment and bracing

    Phase 2

    After framing, before insulation and drywall

    Pre-Drywall / Framing Inspection

    The most valuable inspection in new construction. I examine the framing, structural connections, plumbing and electrical rough-ins, and HVAC layout while they are still accessible. This is your last chance to catch hidden defects before they are sealed behind walls.

    • Framing, studs, joists, and load paths
    • Plumbing and electrical rough-in placement
    • HVAC ductwork and distribution
    • Window, door, and flashing installation

    Phase 3

    Before closing / move-in

    Final Inspection

    A full top-to-bottom inspection of the finished home - the same thorough, system-by-system evaluation as a standard home inspection, plus verification that work was completed to plan and that no defects were covered up during construction.

    • All major systems tested and documented
    • Finish work, trim, and appliance verification
    • Code and workmanship red flags
    • Punch-list items before you sign
    What's Checked

    What I Look For During Construction

    Every phase focuses on the components that will soon be hidden. Here is exactly what I evaluate while it is still accessible.

    Foundation & Structure

    Footings, foundation walls, framing, load paths, and structural connections verified against the plans.

    Plumbing Rough-In

    Supply and waste line placement, slope, support, and protection before they are sealed behind walls.

    Electrical Rough-In

    Wire routing, box placement, grounding, and panel setup inspected while still accessible.

    HVAC & Ventilation

    Ductwork runs, register placement, and ventilation paths checked for proper design and installation.

    Workmanship

    Quality of framing, flashing, windows, doors, and exterior weatherproofing evaluated for defects.

    Code & Safety

    Potential code issues and safety concerns flagged so the builder can correct them before closing.

    Independent of the Builder

    I work for you, not the contractor.

    Timely Scheduling

    Inspections aligned to your build timeline.

    Same-Day Reports

    Photo-rich report delivered within hours.

    Building New? Let Me Protect Your Investment

    Schedule a new construction inspection at any phase - or book all three for full coverage from foundation to final.

    Use code SAVE20 to save $20 when you schedule online!